
First validation results with the Lamasquère ROSAS instru...
=> Following its installation in March 2021, our new ROSAS device at Lamasquère has produced a first series of acquisitions […]
=> Following its installation in March 2021, our new ROSAS device at Lamasquère has produced a first series of acquisitions […]
=> Suite à sa mise en place en mars 2021, notre nouveau dispositif ROSAS de Lamasquère a produit une première […]
=> Field work rarely goes without a few small hazards. In the case of our new ROSAS station, newly installed […]
=> L’acquisition de mesures sur le terrain se passe rarement sans quelques petits aléas. Dans le cas de notre nouvelle […]
These space engineers are fast and efficient ! Just a week after our ROSAS station in Lamasquère was erected, […]
=> At last! We announced it in March 2020, and here it is, one year later! From lock-downs to constraints […]
=> Enfin ! Nous vous l’avions annoncé en mars 2020, la voici opérationnelle un an plus tard. De confinements en […]
The European Union is planning a new generation of the Sentinel-2 mission in 2030 or soon after. The main request […]
This is the final post of a series of studies we did to find out how far we can […]
Introduction To perform a correction of directional effect, directional models are required. A large number of directional models have been […]