Skip to content
SMOS blog
  • Documents
    • Reference documents
    • Technical reports
    • Publications
    • Memoconf
      • Memo Conf – Archive 2011
      • Memo Conf – Archive 2012
    • Links
  • Homepage
  • News
  • Very Strong RFI in China is still ON!!
  • Data / Tools
    • data
    • Tools
    • FAQ
    • Performance Monitor
      • Configuration
      • L3 CATDS performance (zoom and pan)
      • L3 CATDS Performances
      • Performances (L1 and L2 soil moisture products)
      • Performances L1 and L2 soil moisture (zoom & pan plots)
      • Versions
      • Soil moisture monitor
    • RFI Monitoring
      • RFI Characterization – Earth 2D
      • RFI Characterization – Earth 3D
      • RFI Probability
    • Drought Monitor
  • Projects pages
    • SMOS+NN
      • Documents
  • Team
    • Current team
    • Team (2009)

Category: Commissioning phase

Commissioning phase Data Satellite

Updated Orbit Scenario File

Thanks to Berthyl, Amparo, Montse et al.  we have now the updated Orbit scenario file !This is to be used  […]

SMOS blog -- December 18, 2009 0

Commissioning phase Data L1

Bad Guys : we know where you are!

Smos is operating at L Band in a protected window i.e., 1400-1427 MHz. This means that emission are FORBIDDEN in […]

SMOS blog -- December 15, 2009 0

Commissioning phase L1

Comparison of SMOS Tb with model1 Tb

1. OverviewOne ascending orbit of dual polarization (No. 251) and one descending orbit of full polarization (No. 388) are chosen […]

SMOS blog -- December 14, 2009 0

Commissioning phase Data L1 Satellite

Scary movie

On this movie made by the L1PP team you can see the field of view of SMOS at the antenna […]

SMOS blog -- December 10, 2009 0

Commissioning phase L1

New L1 processor

Even considering that calibration data will only start to gflow in this coming week and the FTT data will only […]

SMOS blog -- December 9, 2009 0

Commissioning phase Data Satellite

News from ESAC

Last week was a bit hectic as several problems occurred. Directly correlated to single event upsets (heavy ions and similar […]

SMOS blog -- December 9, 2009 0

Commissioning phase Data

Vous avez un portable ?

Depuis que l’instrument est allumé et les premières images, tout le monde a pu voir que les données étaient pas […]

SMOS blog -- December 4, 2009 0

Commissioning phase L2

Première synthèse SM

Le DPGS a commencé à produire des niveau 2 aujourd’hui. Les données sont disponibles sur le ftp.Toujours avec un étalonnage […]

SMOS blog -- December 3, 2009 0

Commissioning phase L2

Meilleure calibration = meilleure SM ?

Avec la première GMatrix générée en orbite, le L1PP commence à fournir des données mieux focalisées et calibrées. J’en ai […]

SMOS blog -- December 2, 2009 0

Posts navigation

Older posts
Newer posts

© Copyright

Nous utilisons des cookies pour vous garantir la meilleure expérience sur notre site web. Si vous continuez à utiliser ce site, nous supposerons que vous en êtes satisfait.Ok