Skip to content
SMOS blog
  • Documents
    • Reference documents
    • Technical reports
    • Publications
    • Memoconf
      • Memo Conf – Archive 2011
      • Memo Conf – Archive 2012
    • Links
  • Homepage
  • News
  • Very Strong RFI in China is still ON!!
  • Data / Tools
    • data
    • Tools
    • FAQ
    • Performance Monitor
      • Configuration
      • L3 CATDS performance (zoom and pan)
      • L3 CATDS Performances
      • Performances (L1 and L2 soil moisture products)
      • Performances L1 and L2 soil moisture (zoom & pan plots)
      • Versions
      • Soil moisture monitor
    • RFI Monitoring
      • RFI Characterization – Earth 2D
      • RFI Characterization – Earth 3D
      • RFI Probability
    • Drought Monitor
  • Projects pages
    • SMOS+NN
      • Documents
  • Team
    • Current team
    • Team (2009)

Archives

Commissioning phase Data Satellite

Updated Orbit Scenario File

Thanks to Berthyl, Amparo, Montse et al.  we have now the updated Orbit scenario file !This is to be used  […]

SMOS blog -- December 18, 2009 0

Commissioning phase Data L1

Bad Guys : we know where you are!

Smos is operating at L Band in a protected window i.e., 1400-1427 MHz. This means that emission are FORBIDDEN in […]

SMOS blog -- December 15, 2009 0

Commissioning phase L1

Comparison of SMOS Tb with model1 Tb

1. OverviewOne ascending orbit of dual polarization (No. 251) and one descending orbit of full polarization (No. 388) are chosen […]

SMOS blog -- December 14, 2009 0

Commissioning phase Data L1 Satellite

Scary movie

On this movie made by the L1PP team you can see the field of view of SMOS at the antenna […]

SMOS blog -- December 10, 2009 0

Commissioning phase L1

New L1 processor

Even considering that calibration data will only start to gflow in this coming week and the FTT data will only […]

SMOS blog -- December 9, 2009 0

Commissioning phase Data Satellite

News from ESAC

Last week was a bit hectic as several problems occurred. Directly correlated to single event upsets (heavy ions and similar […]

SMOS blog -- December 9, 2009 0

Commissioning phase Data

Vous avez un portable ?

Depuis que l’instrument est allumé et les premières images, tout le monde a pu voir que les données étaient pas […]

SMOS blog -- December 4, 2009 0

Commissioning phase L2

Première synthèse SM

Le DPGS a commencé à produire des niveau 2 aujourd’hui. Les données sont disponibles sur le ftp.Toujours avec un étalonnage […]

SMOS blog -- December 3, 2009 0

Commissioning phase L2

Meilleure calibration = meilleure SM ?

Avec la première GMatrix générée en orbite, le L1PP commence à fournir des données mieux focalisées et calibrées. J’en ai […]

SMOS blog -- December 2, 2009 0

Posts navigation

Older posts
Newer posts

© Copyright

Nous utilisons des cookies pour vous garantir la meilleure expérience sur notre site web. Si vous continuez à utiliser ce site, nous supposerons que vous en êtes satisfait.